Global Building and Design Directory is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Installation

Installation

Precondition Ahead installation the analysis of the soil conditions and the selection of the right Spinnanker type has to be done. For the installation a simple hand-held machine is adequate. This machine can be operated by a skilled labour with a short briefing. Installation instruction With just six steps a successful installation of a Spinnanker foundation is done. 1. Marking foundation / anchoring point 2. Pre-drilling for the centring tool and screwing in the installation aid 3. Positioning ground plate 4. Attaching hi-torque drilling machine and insert treaded rods 5. Screwing in 6 or 12 bars into the ground 6. Fitting of mounting plate and construction connectors Hi-torque drilling machine The machine is in reference to torque and motor speed balanced to the needs of the Spinnanker technique. The operating voltage for the gear reduced machine is 220 V. The weight of the installation tool is just 10 kg which makes transportation even in heavy terrain easy. Actually for high loads no giant equipment like excavator or drilling equipment is necessary. Building licence The Spinnanker foundation comes with a building licence. Due to that no further permission is necessary. The installation can be done all-season.

View this product at spinnanker.com